    What is manufacturing throughput time?

    Manufacturing throughput time is the amount of time required for a product to pass through a manufacturing process, thereby being converted from raw materials into finished goods. The concept also applies to the processing of raw materials into a component or sub-assembly.

    The time required for something to pass through a manufacturing process covers the entire period from when it first enters manufacturing until it exits manufacturing - which includes the following time intervals:

    • Processing time. This is the time spent transforming raw materials into finished goods.
    • Inspection time. This is the time spent inspecting raw materials, work-in-process, and finished goods, possibly at multiple stages of the production process.
    • Move time. This is the time required to move items into and out of the manufacturing area, as well as between workstations within the production area.
    • Queue time. This is the time spent waiting prior to the processing, inspection, and move activities.

    The concept of manufacturing throughput time is primarily oriented toward the reduction of time required by the manufacturing process, so that you can increase the amount of throughput flowing through your system and thereby increase profitability. Throughput is net sales minus totally variable expenses. The bulk of the time spent in manufacturing tends not to be in processing, but rather in the inspection, move, and queue times noted above. Thus, it is easiest to reduce manufacturing throughput time by eliminating as much inspection, move, and queue time as possible.

    Example of Manufacturing Throughput Time

    The production manager of ABC International wants to calculate the manufacturing throughput time for its blue one-armed widget. He accumulates the following information:

    • Processing time = 3 hours
    • Inspection time = 0.5 hours
    • Move time = 1 hour
    • Queue time = 12 hours

    Thus, the total manufacturing throughput time for the blue one-armed widget product is 16.5 hours. Further, the production manager has a golden opportunity to reduce the throughput time, since the amount of queue time is nearly three-quarters of the total throughput time, and can probably be reduced without too much trouble.

    Similar Terms

    Manufacturing throughput time is also known as production throughput time or throughput time.

    Related Topics

    Opportunity cost of operations
    Theory of constraints
    Throughput analysis
    Types of capacity
    Types of constraints 

     

    PrintView Printer Friendly Version

    EmailEmail Article to Friend

    Reader Comments

    There are no comments for this journal entry. To create a new comment, use the form below.
    Editor Permission Required
    You must have editing permission for this entry in order to post comments.